Xentral × fulfillment switch

Switch fulfillment providers.
Move Xentral cleanly.

We plan the transition from your old to your new 3PL – including inventory, open orders, returns, master data, integration and cutover.

Inventory migrationOpen ordersReturnsCutover & hypercare
The critical pointNot the warehouse move.
The transition.
XentralOrders · inventory · documents
Until cutoverOld 3PLOld orders · residual stock · returns
Cutover dateCutoverFreeze · reconcile · reroute
After go-liveNew 3PLNew stock · new orders · status

Why switches fail

A new 3PL can be connected quickly.
Your old operation does not disappear.

During the transition, physical stock, open orders and digital feedback keep moving at the same time. That overlap needs to be designed deliberately. If other processes also need attention, our Xentral experts can support you beyond the switch.

The move only works when everyone knows
which system is the source of truth at which moment.

What has to move together

Six topics. One cutover.

We treat the switch as an operational transition, not as a standalone interface task.

01

Inventory

Old stock, stock in transit, blocked quantities and receipt at the new 3PL must result in one reconciled cutover stock.

02

Open orders

Already transmitted, not yet transmitted and partially shipped orders need clear ownership.

03

Products & mapping

SKUs, EANs, variants, packaging units, shipping codes and relevant warehouse attributes are checked before go-live.

04

Returns

Returns may keep arriving at the old provider for weeks after cutover, so the transition needs its own return logic.

05

Shipping & tracking

Carrier, tracking number and shipment status must remain linked to the right order throughout the parallel phase.

06

Automations

Status-driven follow-up processes, invoicing, shop feedback and other automations are reviewed after the integration changes.

Cutover plan

Before. Cutover. After.

The exact sequence depends on the logistics partner. The principle is consistent: prepare, freeze or clearly separate, reconcile and switch in a controlled way.

Phase A

Before the move

  • Define target process and integration
  • Validate product and warehouse mapping
  • Test orders and feedback
  • Classify open orders
  • Define returns and inbound logic
Phase B

Cutover

  • Switch order routing deliberately
  • Separate inventory movements
  • Reconcile old and new stock
  • Track final old-provider orders
  • Validate first live orders at the new 3PL
Phase C

After go-live

  • Monitor stock and tracking closely
  • Check errors and duplicate feedback
  • Close remaining old cases
  • Process transition-period returns
  • Move to normal operations only after stability

Our approach

A fulfillment-provider switch in seven clear steps.

  1. 01

    Map the current process

    Which data flows where today? Which automations depend on the existing provider?

  2. 02

    Define the target process

    We define how orders, inventory, shipping, inbound and returns will work in future.

  3. 03

    Prepare the new integration

    Mappings, credentials, data objects, triggers and responses are configured and documented.

  4. 04

    Run the test matrix

    Not just the happy path: cancellation, partial shipment, stock issue, return and duplicate status are included.

  5. 05

    Plan stock migration

    Freeze, physical movement, goods receipt and final reconciliation are aligned.

  6. 06

    Execute cutover

    From the agreed point, new orders go to the new 3PL while old cases remain visible and controlled.

  7. 07

    Hypercare & closure

    The first live days are closely monitored until inventory, shipping, tracking and returns are stable.

Test matrix

One successful test order is not enough.

We test the cases that create operational work so problems become visible before cutover.

Standard orderfully available · tracking returns
Partial shipmentremaining quantity stays open
Cancellationbefore and after transmission
Stock shortagefeedback and follow-up process
Returngoods receipt and stock impact
Duplicate feedbackno duplicate shipment or booking

Ownership

Four parties. No grey area.

Xendoit

Xentral & cutover

Data flows, ERP configuration, test cases, coordination, go-live and Xentral-side troubleshooting.

Old 3PL

Close cleanly

Residual stock, open cases, returns, final shipment feedback and handover of relevant data.

New 3PL

Take over cleanly

Master data, warehouse setup, inbound receipt, order processing and feedback in the new WMS.

Your team

Make decisions

Cutover date, priorities, exceptions, approvals and business acceptance of the new workflows.

Definition of done

When is the switch actually complete?

  • Inventory between Xentral and the new 3PL is reconciled.
  • New orders use only the defined target process.
  • Tracking and shipment status return reliably.
  • Old open orders and residual cases are resolved.
  • Returns from old and new processes can be handled unambiguously.
  • No permanent manual workaround is required for normal operations.

FAQ

Questions about switching fulfillment providers with Xentral.

The key points around stock migration, open orders, parallel operation and cutover.

How do you switch fulfillment providers with Xentral?

Treat the move as a controlled cutover. Prepare the target process, integration and master data first, then test orders and feedback. Inventory, open orders, returns and inbound receipts are reconciled around the cutover date and closely monitored after go-live.

Can the old 3PL keep shipping during the transition?

Yes. A transition or parallel phase is often useful. The key is to define exactly which provider owns which orders and from which point new orders are sent only to the new fulfillment provider.

How is inventory migrated when switching 3PLs?

Before cutover, stock at the old provider is reconciled. During the physical move you need either a booking freeze or a clearly defined transaction process. After receipt at the new 3PL, quantities are reconciled again before they are treated as available.

What happens to open orders during the switch?

Open orders need to be classified in advance: already in processing, not yet transmitted, partially shipped or still cancellable. For each group, decide whether the old provider completes it or the order moves to the new 3PL.

How should returns be handled during the transition?

Returns need a dedicated transition rule. Parcels may still arrive at the old provider while new orders are already fulfilled by the new one. Return address, booking logic and stock impact therefore need to be defined before cutover.

Do we need a completely new Xentral interface for the new 3PL?

Not necessarily. An existing integration may be reused or adapted. If the technical method changes, downstream automations such as shipment status, tracking, inventory synchronisation and document workflows should also be reviewed.

How long does a fulfillment-provider switch take?

That depends on data quality, integration method, warehouse scope and the physical stock move. A reliable cutover with tested data flows and clear ownership matters more than an artificially short timeline.

When is the switch actually complete?

Not after the first successful shipment. The move is complete when inventory is reconciled, old open orders are resolved, tracking and status feedback are stable, returns work and the first production days run without manual workarounds.

A 15-minute introduction

Your new 3PL is selected?
Then let's plan the transition.

Bring the current and target logistics process. We clarify which data flows, inventory and open cases need to be covered during the switch.

Daniel Schmidtchen
Daniel Schmidtchen & teamXentral · Fulfillment · Cutover

Three inputs are enough to start.

  1. Old 3PLHow does the integration work today?
  2. New 3PLWhich interface and processes are planned?
  3. Target dateWhen should the operational handover happen?
Discuss your 3PL switch

15 minutes · no obligation · Calendly opens in a new tab.